Calculate Concrete For Floor And Ready-Mix Delivery And Fees

Calculate the concrete for a house, basement, garage, or shop floor, then plan your ready-mix delivery. Enter floor size, slab thickness, truck size, and supplier fees. Get the order in cubic yards, number of trucks, load sizes, and total cost, with no signup required.

What do you need?
Units
ft
ft
in
Vapor barrier under the slab
5%
0%15%
Including waste
yd³
Truck SizeMax per load
— —
Per cubic yard
$
Per truck
$
Per small load
$
Ask your supplier
yd³
Concrete to Order
0yd³
Trucks
0
Floor Area
0
Each Load
0
Total Cost
—
Works for basement floors, garage slabs, shop floors, and any ready-mix order · Includes delivery fees and short-load fees.

What This Concrete Calculator Does

This concrete calculator does two things. First, it works out how much concrete your floor slab needs. Second, it plans how that concrete reaches your site by truck.

Most other tools stop at cubic yards. However, your real cost also depends on truck size, delivery fees, and short-load fees. This calculator handles all of them together.

It’s part of our complete line of concrete calculators. For outdoor slabs and pads, the slab and pad concrete calculator also works well.

How to Use the Calculator

Step#1: Choose Floor or Delivery

Select Concrete Floor to start from dimensions. Select Ready-Mix Delivery if you already know your total yards.

Step#2: Enter Floor Size and Thickness

Enter the length and width. Then tap 4″ for a house or basement, 5″ for a garage, or 6″ for a shop.

Step#3: Choose a Vapor Barrier and Waste

Select whether you’ll use a vapor barrier under the slab. Next, set your waste for an uneven base.

Step#4: Add Truck Size and Supplier Prices

Enter your supplier’s maximum load per truck. Then add the price per yard, delivery fee, short-load fee, and the short-load limit.

Review Your Order

You’ll see the yards to order, number of trucks, each load size, floor area, and total cost.

Formulas Behind Each Mode

Concrete Floor Formula

Volume (yd³) = Length × Width × (Thickness ÷ 12) ÷ 27 × (1 + Waste)

The waste slider here runs from 0% to 15%, with 5% as the default. Indoor floors usually sit on a graded, compacted base. So they need less extra than rough outdoor pours.

For example, a 30 × 40 ft garage at 5 inches needs about 18.52 yd³. With 5% waste, that’s about 19.44 yd³.

Rounding Rule

Order = Volume rounded up to the next ¼ yard (or ¼ m³)

Most suppliers sell concrete in quarter-yard steps. So 19.44 yd³ becomes an order of 19.5 yd³.

Truck and Load Formula

Trucks = Order ÷ Truck size, rounded up Each load = Order ÷ Trucks

The calculator splits your order into equal loads. This mirrors how most suppliers dispatch trucks.

For example, 19.5 yd³ with 10-yard trucks needs 2 trucks of 9.75 yd³ each.

Total Cost Formula

Cost = (Order × Price per yd³) + (Trucks × Delivery fee) + Short-load fee (if any load is under the limit)

How Load Splitting Changes Your Cost

Truck math can surprise you. A tiny amount over one full load adds a whole extra truck.

Order Size Truck Max Trucks Each Load
9.5 yd³
10 yd³
1
9.5 yd³
10.25 yd³
10 yd³
2
5.125 yd³
19.5 yd³
10 yd³
2
9.75 yd³
21 yd³
10 yd³
3
7 yd³

Look at the 10.25-yard row. Just a quarter yard over the limit doubles your delivery fees. So if you’re barely over, check whether a slightly thinner waste allowance still covers you safely.

Short-load fees work the other way. Small orders under your supplier’s minimum get an extra charge. For tiny pours, bagged concrete may cost less. Compare both with our concrete bag calculator.

Floor Thickness Guide

Floor Type Typical Thickness Concrete per 100 ft²
House or basement floor
4 inches
≈ 1.23 yd³
Garage floor
5 inches
≈ 1.54 yd³
Shop or heavy trucks
6 inches
≈ 1.85 yd³

Garage and shop floors also benefit from reinforcement. Estimate bars or mesh with our rebar and wire mesh calculator.

Why a Vapor Barrier Matters

Ground moisture rises through concrete over time. It can ruin flooring glue, warp wood floors, and cause musty smells.

A plastic vapor barrier under the slab blocks that moisture. Many US residential codes require at least 6-mil polyethylene under interior floor slabs. Many builders choose thicker sheets for better tear resistance.

Overlap the seams and tape them. Also, repair any punctures before the pour.

How This Calculator Works

Our calculator follows a simple, open method.

First, it multiplies floor length, width, and thickness. Next, it adds your waste percentage. Then it rounds the total up to the next quarter yard, the way most suppliers sell concrete.

After that, it divides the order by your truck size and rounds up to find trucks. It splits the order into equal loads. Finally, it adds concrete cost, delivery fees, and any short-load fee.

Delivery and short-load fees vary widely by supplier. So always confirm your numbers with a direct quote.

Scroll to Top